It has been a busy year.

I had projects waiting for me when I got home from Christmas holidays, and the work hasn’t stopped since.

It has been pretty tiring at times too. Working evenings and weekends? Check. Working on two indexes at once? Check. Have projects that take longer to finish that anticipated? Check. Have books arrive either earlier or later than scheduled? Check again.

Book publishing is definitely dynamic. Each book has its own production schedule. Each production schedule involves multiple editors, proofreaders, designers, and even, sometimes, an indexer, not to mention the author. Each editor/proofreader/designer/indexer is themselves most likely working on multiple projects at once, or at least has the next project lined up for when the current one is finished. The system is ripe for schedule slippage, for deadlines overlapping, for projects banging into the next, you eyeing the calendar and the clock trying like hell to put this baby to bed so that you can get on to the next project, with its own increasingly looming deadline.

It gets chaotic. With multiple schedules piling up, I feel like I am surfing, trying to stay ahead of the wave, reach the shore in one smooth movement, before heading back out to sea to catch the next wave. What can happen instead, though, is that I lose my balance, the wave knocks me off my board, I get buffeted around in the surf for a while before I can surface and breathe again. At that point either the next wave has already passed me by or it is right on top of me.

So, schedules. They are important.

I have been learning this anew these last seven months, the busiest winter and spring I’ve had so far as a freelancer. But it is important to note, however, that there are two types of schedules at play. The first, which I have already mentioned, is the production schedule that each book is on. This I have very little control over. If the schedule doesn’t suit me, I can ask my client if the schedule can be changed. Sometimes the client is able to accommodate me and sometimes they can’t, at which point either I change my schedule or another freelancer gets the project.

The second schedule, which I do have more control over, is my personal daily/weekly/monthly work schedule. This kind of schedule is important too, if I am going to efficiently and effectively complete the indexing and proofreading projects that I have accepted. It has been this type of schedule that I’ve been learning that I really need to tighten up.

Specifically, here, I want to write about scheduling in what I call the easy books. If you work in publishing, you probably know the type. For me they are usually trade books, sometimes coffee table style, heavily illustrated. The subject matter is often engaging, and written in a fairly light manner. It usually isn’t long, maybe 200-250 pages, and the index won’t be long either.

I really enjoy these books. I enjoy many of the dense, academic books I get to index too, but after a dense book these short, trade books are just so fun and refreshing in comparison. They can be a good pick-me-up after slogging through a heavy 400 page tome.

I figure I can usually index the easy books in 10-15 hours, sometimes less. Surely I can find time for 10-15 hours over the course of a couple of weeks, right?

That is what I thought too until I started to notice a pattern over these last few months. When schedules got really tight, I found that I was focusing on the most difficult indexes first, because those where the deadlines I was most scared of. I wasn’t putting the time I needed into the easy books until the last minute, usually, at which point it was a mad scramble to finish the index. The “fun” indexes weren’t so funny anymore. They became a source of stress, feeling like I had taken on more work than I should have.

Was it really too much work, though, or was it a scheduling problem? A month ago I had another of these easy indexes to complete, and I decided to focus on my schedule. I still had a larger, more complex scholarly book to index as well, which I knew was going to take the bulk of my time and attention. But instead of spending all of my time on the scholarly book, I decided to take the first hour of work every morning and devote it to the easy book. It wasn’t much, an hour. I indexed maybe 20-30 pages in that time. But as I discovered, it was enough.

I chose to index the easy book in the morning so that I wouldn’t be tempted in the late afternoon or evening to push it off because I was tired from the hard book. Because I wasn’t indexing at the last minute I actually got to enjoy the easy book, which was a large part of why I had accepted it in the first place. I still had the whole rest of the day to work on the more difficult book. When it came time to edit the easier index, I still scheduled a full day to do that as I find it easier to edit in one long go than to break it up with another project, but scheduling one day is a whole lot easier than trying to squeeze in multiple days at the last minute. In the end, both the easy index and the more difficult index were finished on time and fairly stress-free. Success!

Is there anything else about my personal work schedule that I can change? Probably. I’ll take another look and perhaps write about this again. I think that work is more enjoyable and productive in a relatively stress-free environment, and schedules are certainly part of that equation.

In the meantime, what scheduling tips do you have for managing tight deadlines and multiple projects? I would love to hear.